Title

Jordon Cove Urban Watershed Project

Document Type

Article

Publication Date

2002

Abstract

The water quality objectives of the project are: • To retain sediment on site during construction; • To reduce nitrogen, bacteria, and phosphorus export by 65%, 85%, and 40%, respectively; • To maintain post-development runoff peak rate and volume at pre-development levels; and • To maintain the total suspended solids load at pre-development levels.